jmdashay2 jmdashay2
  • 15-01-2020
  • Computers and Technology
contestada

which software development team memeber is responsible for the timeline and budget

Respuesta :

bentuzene
bentuzene bentuzene
  • 17-01-2020

Answer:

The Project Manager

Explanation:

This person's job is to manage the project budget and map out how much time would be spent on each phase. Also his/her job is to ensure that all deliverables and on time.

Answer Link

Otras preguntas

Write the equation of the line that passes through (4, 2) and is parallel to the line y = 2x – 1. A. x – y = 6 B. 2x – y = 6 C. 2x – y = 1 D. 2x – y = –1
Name the U.S. protective branch that uses the code names "Mogul" and "Renegade" for the president-elect and the president
There are 3/4 as many boys as girls in a class of 5th graders if there are 35 students in the class how many are girls?
What ocean contains most of the worlds active volcanoes?
All languages rely on word order for syntax. True False
What was the main objection that people had to John Quincy Adams's election by the House of Representatives? A. William Crawford won the popular vote, so people
Which two points of view are used in this excerpt from “Games at Twilight” by Anita Desai? It then occurred to him that he could have slipped out long ago, das
What two numbers multiplied together equal -36 but then added together equal 16
What was the name of Gorbachev reform movement
what it means to view something from a frame of reference.