matthewmui8 matthewmui8
  • 22-05-2020
  • Mathematics
contestada

if 4 workers can complete a job in 12 days, how many days will it take 3 workers to complete the same job

Respuesta :

babygirl2821
babygirl2821 babygirl2821
  • 22-05-2020
Is there any answer or something
Answer Link

Otras preguntas

BRAINLIST AND 10 POINTS Name three changes in France as a result of the Constitution of 1791.
What is the slope of the line that passes through point (3,2) and point (6,11)?
Select ALL the correct words in the passage. Read each sentence and select three words or phrases after which a Colin should be placed.
a person reaching out to the edge of a building edge of a building ledge 85 feet off the ground flicks a twig up and off the ledge with an initial upward veloc
What does a reader need to do before making a prediction about what will happen in a story?
A role model is someone people admire and want to be like. Compare positive and negative role models for drug abuse. Write a paragraph that includes at least 2
Zero property 2x^3+x^2-3x=0
what does the character Mrs johnson most likely symbolize in the play the american dream
I'm stuck on this, please help!
What is the exact volume of the figure?