If 6 men finish a piece of work in 8 days, how long will it rake 4 men to​

Respuesta :

prasamsharayamajhi
prasamsharayamajhi prasamsharayamajhi
  • 16-01-2022

Answer:

6 men finish a piece of work in 8 days

1 men finish a piece of work in 8*6 days

4men will finish a piece of work in 48/4

days

..

which is equal to 12 days

Answer Link
aamtally
aamtally aamtally
  • 16-01-2022
6 men working 8days = 48man days
So if 4men were to do same work then=48/4 =12 days
So it takes 12 days
Answer Link

Otras preguntas

Given that Annie chooses a red shirt at random, what is the probability that the shirt will be large? Use the formula P(A | B)= P(A^B)/ P(B). Plz reply asap
I need help Sloving this question
what are the two main functions of forming concepts?
the cost of using a card is 35 cents per call plus 25 cents per minute. A recent call cost cost $12.35. write and solve the equation for the length of the call
What's the source of the word tuxedo
"There is no frigate like a book to take us lands away" means that. A. No ship can carry us to far-off places the way a book can.
4. Every preposition must have a/an
Gambarlah garis k yang melalui titik P(-3, -5) yang tidak sejajar dengan sumbu y dan tidak sejajar dengan sumbu x
On arriving at the elegant Chez Moulin for a catered dinner, the guests discover that a large plate, called a _______, will remain at their place setting to rec
During the Great War, the Food Administration was headed by