ambikathapa2010 ambikathapa2010
  • 12-02-2022
  • Mathematics
contestada

sanaya can do 1/3 part of a work in 1 day and chahanaa can do1/4 part of the same work in 1 day .How much work would they do working together​

Respuesta :

nyajahdonawa811 nyajahdonawa811
  • 12-02-2022

Answer: 36/5= 7.2 days to complete sanaya work day

Step-by-step explanation:

Answer Link

Otras preguntas

what are signal phrases
The trick of taxonomy is basically Iguring out what?
Please Helppp!!! It was due Yesterday
What number must you add to complete the square x^2+4x=12
Which of the following refers to the location of the primary office? A. Home base B. Foreign base C. IHR office D. International Labor Organization
Drag each tile to the correct box. Arrange these stages of website design in the order that they follow developing planning learning designing testing and deliv
A student at a four-year college claims that average enrollment at four-year colleges is higher than at two-year colleges in the United States. Two surveys are
Roberto has twice the mass his sister Mary has but runs at the same velocity as Mary. Will his kinetic energy be twice as much? (Mary has a mass of 40 kg and sp
An increase in which gas in earths atmosphere will significantly increase global temperatures? A) methane B) oxygen C) nitrogen D) hydrogen HELP
Point J(8,5) was translated as follows: J(8,5) ► J'(2,9). A student wrote the algebraic rule to describe the translation as (x3) → (x+6.7+4). Evaluate the stude