ahmaduae629 ahmaduae629
  • 13-05-2022
  • Physics
contestada

Ahmad pulls a sled across level snow by 75 N . If the sled moves 15 m , how much work does Ahmad do on the sled?

Respuesta :

ancyvarghese ancyvarghese
  • 13-05-2022

Answer:

1125 J

Explanation:

W=F x s

= 75 x 15

=1125

Answer Link

Otras preguntas

Robert Owen believed that people who lived in a good environment would stop acting a. charitably c. selfishly b. socially d. academically Please select the best
This is an angle relationship problem
The radius of a cylindrical construction pipe is 2 ft. If the pipe is 17 ft long, what is its volume? Use the value 3.14 for it, and round your answer to the ne
which of below Is something not do with our natural resources? Recycle, reduce, or reuse?​
I really need help guys plz help me and thank you.
What is the area of a regular pentagon if its apothem has a length of 4 feet and each side has a length of 5.8 feet? a 139.2 ft? b. 58 ft2 C. 116 ft2 d 69.6 ft-
Convert the following units. 3 feet =______ inches​
Identify whether the following equation has a unique solution, no solution, or infinitely many solutions. 2( − 4) = 10 − 8 − 8 A unique solution B no solution
Pls help with my homework, 5,11,12
Can someone help me please =) it would mean the world! =)