A construction firm is building a football stadium. The building work has taken 499 days so far. It should take another 199 days to build. How many days will the building work take in total

Respuesta :

thompmk
thompmk thompmk
  • 13-05-2022

499

199

+-------  the answer is 698 you have to add 499 and 199.

Answer Link

Otras preguntas

Carmen, Reuben, and Jim sent a total of 156 text messages over their cell phones during the weekend. Jim sent 6 fewer messages than Carmen. Reuben sent 4 times
Never before had a human being experienced a silence so absolute. In 1965 he was 300 miles above the Earth, and what no one knew was that he was minutes from de
A=2 b=2 c=1 Find the value of 2abcosC
pls help me with my homework
Please help me i'll give brainliest if its correct
What is the answer of this question?
Which inequality does this graph represent? –1 < x –1 Less-than-or-equal-to x x < –1 x Less-than-or-equal-to –1
A pendulum clock is taken to the moon (g = 1.6 N/kg). How long must the pendulum be in order for the clock to continue keeping accurate time (1 second cycle)? 3
What is a solution? A)shown in picture B)shown in picture C)shown in picture D)shown in picture
enough energy is added to matter in the liquid state, it will change into a different state. During this change of state the particles would C A. contract into