darianlitchfiel darianlitchfiel
  • 15-02-2018
  • Mathematics
contestada

Problem Page A construction crew has just built a new road. It took them 3 weeks to build 18.75 kilometers of road. At what rate did they build the road?

Respuesta :

cherrygreyson cherrygreyson
  • 15-02-2018
(635 kilometers)/(3 days)                       635/3    kilometers/day                        211  2/3    kilometers/day
Answer Link

Otras preguntas

What is the reason for each step in the solution of the inequality? −2(x+3)−4>4x+30 Select the reason for each step from the drop-down menus. 2nd picture is
Briefly describe three (3) functions of the Urinary System
What is the area of trapezoid ABCD ? (Enter your answer as a decimal or whole number)
The foreigners who arrived in california in the late 1840s could best be described as
Is Jesus a prophet according to Islam?
3.4−2.8d+2.8d−1.3 Combine like terms to simplify the expression
why do cells have plasma membrane? A) to separate proteins from the nucleus B) to distinguish plants from animals C) to define the size of a cell D) to separate
Here’s one interpretation of one of the world’s most famous paintings. But which artist painted the original?
List three of Powers of the Judicial Branch
d. Convert binary fraction .10112 to Decimal fraction.