sí 8 trabajadores tardan 5 días en hacer una obra, cuánto tardarán si son 16 trabajadores, Y si son 4 trabajadores. proporcionalidad

Respuesta :

amendocrr amendocrr
  • 14-04-2018
si son 16 trabajadores serian 10 días porque 8 es la mitad de 16 y si fueran 4 trabajadores seria 2.5 días 

Answer Link

Otras preguntas

What is 3x = 99 - 35x + 12 - 10 / 6
Rewrite the expressions below as the sum of one constant and one variable term. 2(x - 4) + 6x - 5x . 3 PLEASE HELP ME
The function f(x) varies inversely with x and f(x) = 0.2 when x = 0.4. What is f(x) when x = 1.6? 0.05 0.08 0.20 0.40
What is the meaning of the phrase “fancy clear” as it is used in line 3 of the poem?
Which sentence best describes the effect of geographical setting on the developing conflict? The stony beach and pine trees make Malaga Island an attractive pl
what did the native chinese think about being ruled by the mongols
The leading cause of impaired surface waters in the united states is:
What type of character illustrates many of the traits associated with his or her stereotype?        A. Representative   B. Antagonist   C. Protagonist
Write and solve a problem involving money that can be solved with a multiplication equation
What type of posture is described in the following statement? This type of posture occurs when you are performing work that causes you to hold the same posture